TWINVEY Electric Consultancy, currently, is executing about a dozen of Power System study projects of varied nature and complexities.
We have completed over 400 projects mainly consisting of:
Power System Studies: Power Flow, Short Circuit, Voltage drop, Graded protection, Motor Starting and Harmonics studies.
Engineering Design Calculations: Earthing design (Ground Potential Rise, Step & Touch Potentials), Lightning protection calculations, Arc Flash hazard analysis, MV/ LV motor protection relay calculations, Arc Flash protection relay calculations, Unit Protections setting calculations for busbars, transformers/ reactors, etc. at various system voltage levels including for 220kV system.
We have also carried out few projects which involved high degree of technicality. One such project was of resolving starting issues of a 710kW fresh air fan motor that was taken up and resolved for ALEC, the Dubai Airport contractor in Dubai International Airport. The motor and fan were modelled and the behavior during starting was analyzed using mathematical tools and equivalent circuit diagrams before successfully resolving a long pending problem for ALEC.
Another project worth mentioning is that of designing of Steam Turbine (ST) tee-off connections to a 19/11kV transformer for a new RO Plant 11kV feed in ACWA plant in Oman as part of System studies and design review contract for M/s Osmoflo. The challenge of having an isolation facility in the ST tee-off connections which inherently had a very high symmetrical short-circuit levels (of the order of 150kA), was met by use of a 19kV Is Limiter (ABB make), in series with a 25kA distribution-class circuit breaker. This helped saving on a Generator Circuit Breaker (GCB) which otherwise would have posed space and cost constraints.
Yet another project worth of a mention, is, Lightning Protection System (LPS) design for a Bridge structure in the Sea, undertaken for Danway for DP World. The bridge being in the sea, an immersed earthing electrode system was used to achieve grounding of the LPS after due considerations of possible corrosion and erosion of the earthing system; the lighting poles acted as natural air-termination and down-conductor systems.
Whilst all our clients are satisfied with our works, we have got letters from following of our Clients, approving, either our Company or the works/ technical documents produced by us for them:
© 2023 TWINVEY Electric Consultancy
This website uses cookies. By continuing to use this site, you accept our use of cookies.